Seaports (03/29/99)
If your seaport tiles are not developing, this short article should get it going. These are the conditions required for seaport tiles to develop:

The main component of the seaport is the pier, which is an extension of the seawall. Piers will be built at closest, 6 tiles apart. The auxillary buildings will be built around the piers. The more piers a seaport develops, the more sea traffic it will generate. Also, the ports will create much air pollution as well as water pollution, so water pumps should be placed away from a seaport.



Back to Hints


to top